REGISTRO DOI: 10.69849/revistaft/ch10202301040404
Carolina Araújo Moreira Delci
Abstract
4D Building Information Modeling (BIM) is revolutionizing the construction industry by providing an integrated and efficient approach to project management, particularly in large-scale ventures. The primary benefit of 4D BIM lies in its ability to merge the time dimension with the 3D model, enabling detailed simulations of the construction process. These simulations improve visualization, streamline planning, and help identify potential issues early in the process. This proactive approach allows for better resource allocation, optimization, and cost reduction, all of which contribute to faster and more economical project execution.
However, while 4D BIM offers significant advantages, its adoption also comes with challenges. The initial investment in technology and software can be high, requiring specialized training for professionals to manage the system effectively. Furthermore, integrating data from different sources and overcoming organizational resistance can hinder its widespread implementation. The complexity of 4D BIM also necessitates a robust change management strategy to ensure smooth adoption and seamless integration into existing workflows. Despite these challenges, 4D BIM’s potential for enhancing the efficiency and sustainability of construction projects is undeniable. As technology continues to advance, and more case studies demonstrate its success, 4D BIM is becoming an essential tool for large construction projects. Additionally, its integration with innovative practices such as Virtual Design and Construction (VDC) and Integrated Project Delivery (IPD) further strengthens its value, positioning it as a critical element in the future of the construction industry.
Keywords: 4D BIM; Construction Management; Project Scheduling; Resource Optimization; Change Management.
4D Building Information Modeling (BIM) is an extension of traditional BIM that incorporates the time dimension into the three-dimensional model of a construction project, offering a powerful tool for large-scale engineering endeavors. By embedding the project schedule directly into the digital model, 4D BIM enhances the visualization and management of project progress, providing significant advantages in both planning and execution. The primary benefits of 4D BIM include improved project planning and a clearer visualization of the construction phases, which allows teams to anticipate issues and adjust strategies before they occur. By simulating each construction phase, 4D BIM aids in identifying potential conflicts early, thereby facilitating more efficient planning and reducing the likelihood of costly delays or errors during execution. Furthermore, 4D BIM fosters better coordination and collaboration among all stakeholders involved in the project, as it provides an integrated, real-time updated model that everyone can work from.

Figure 1: Plan (4D BIM) and Actual (4D Reality).
Source: Reconstruct.
The ability to simulate multiple scenarios and assess the potential impact of changes also plays a crucial role in risk management, as it helps project managers identify the most effective responses to possible disruptions. This ability to predict and control various elements of the construction process leads to enhanced efficiency and cost savings. By optimizing planning and minimizing rework, projects can be completed more quickly and within budget, which is especially critical for large projects where even small delays can result in substantial additional costs. However, adopting 4D BIM is not without its challenges. One of the key obstacles is the initial investment required for software, training, and process adjustments. The complexity of the technology means that organizations may face a steep learning curve, particularly when staff have limited experience with BIM systems. Moreover, the integration of data from diverse sources and the interoperability of different software platforms can complicate the use of 4D BIM, especially in large projects with varied tools and formats.
Another major challenge is the management of organizational change. Introducing 4D BIM often requires a cultural shift within companies, with some teams resisting the transition to new technologies. Successful implementation therefore requires a carefully planned change management strategy to overcome resistance and ensure widespread adoption across all project teams. Despite these challenges, 4D BIM presents a transformative opportunity for construction project management, provided the necessary resources and strategies are in place.
Recent studies have highlighted both the benefits and challenges of adopting 4D BIM. The research conducted by Doukari, Seck, and Greenwood (2022) explores the difficulties and potential of using BIM, particularly 4D BIM, in project scheduling and decision-making. Despite its promise, the study points out that creating a 4D BIM model still requires significant manual input due to the variability in maturity levels among project participants. The study includes two case studies: one in Paris, which illustrates the manual process, and another that proposes an ontology developed within a European research project to enhance BIM applications in deep renovation projects.
Elghaish and Abrishami (2020) investigated the integration of BIM with Integrated Project Delivery (IPD) to improve project outcomes. Their research suggests that while the methodology for integrating BIM with IPD exists, BIM’s full potential is not being realized without further advancements. Their study proposes automating and optimizing 4D BIM within the IPD context, offering a planning library to streamline schedule creation and multi-objective optimization. This approach led to a cost saving of 22.86%, highlighting the effectiveness of automating these processes in reducing project costs and improving management efficiency.
Mayouf et al. (2024) examined how 4D BIM could be integrated with the lean concept to revolutionize scheduling in modular construction projects. Their study demonstrated that the use of 4D BIM not only improves traditional scheduling methods but also enhances coordination and risk management by offering a more accurate prediction of potential issues during both the design and construction phases. By integrating lean principles, the study offers a model for improved project outcomes that maximizes efficiency and minimizes waste, especially in modular construction contexts.
Ahmadi and Arashpour (2020) discussed the rapid growth of BIM and its impact on various aspects of construction, such as architectural design, construction methodology, and project operations. They specifically addressed the use of 4D BIM in construction planning and scheduling, arguing that adopting BIM in early project stages significantly reduces poor quality work and planning inefficiencies. Their study emphasizes the need for automation in 4D planning and the integration of BIM models into construction programs to enhance project control and efficiency.
Salman and Hamadeh (2023) focused on the relationship between Virtual Design and Construction (VDC) and BIM, investigating how integrating 4D BIM with VDC can improve project scheduling and planning. Their case study of the Pharmacists Syndicate building in Tartus demonstrated how 4D BIM helps optimize the construction process by accurately modeling building elements and simulating construction activities before they occur, thus reducing both time and cost. The study underlined the importance of using virtual environments to manage complex construction tasks, advocating for the adoption of integrated methodologies to ensure successful project outcomes.
Wang et al. (2014) explored how 4D BIM could be enhanced by utilizing BIM’s capability to perform quantity takeoffs for materials such as steel and concrete. By linking these quantities with a project’s network schedule, their study developed a system that allows for site-level operations simulations, considering uncertain durations and competing resource needs. This innovative approach helps generate an optimized construction schedule, ultimately improving project efficiency and resource management. The integration of 4D BIM with project schedules, as demonstrated in their study, significantly improves project management and delivery.
These studies collectively highlight the transformative potential of 4D BIM in improving project management, efficiency, and cost control in large-scale construction projects, while also acknowledging the challenges associated with its adoption and implementation. The future of 4D BIM will depend on overcoming these barriers and continuing to refine the integration of BIM technologies with construction practices.
In conclusion, the use of 4D BIM has the potential to transform construction project management, offering a more efficient and integrated approach to planning and executing large-scale projects. The ability to incorporate time into the three-dimensional BIM model allows for detailed simulations that not only enhance visualization and planning but also help anticipate problems, optimize resources, and reduce costs and timelines. Although the benefits are significant, the adoption of 4D BIM presents challenges such as high initial costs, the need for specialized training, and the integration of data from various sources. Additionally, organizational resistance and the complexity of the technology can hinder implementation in some companies. However, with an effective change management strategy and ongoing efforts to improve interoperability between tools, 4D BIM can be a decisive instrument for enhancing the efficiency and sustainability of construction projects. As technology continues to evolve and more studies highlight its applications and outcomes, it is clear that 4D BIM represents an important step for the future of the construction industry, especially in large projects and the integration of innovative practices like VDC and IPD.
References
Ahmadi, P. F., & Arashpour, M. (2020). An analysis of 4D-BIM construction planning: Advantages, risks and challenges. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 37, pp. 163-170). IAARC Publications.
Doukari, O., Seck, B., & Greenwood, D. (2022). The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches. Buildings. https://doi.org/10.3390/buildings12081145.
Elghaish, F., & Abrishami, S. (2020). Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation. https://doi.org/10.1108/ci-11-2019-0127.
Mayouf, M., Jones, J., Elghaish, F., Emam, H., Ekanayake, E., & Ashayeri, I. (2024). Revolutionising the 4D BIM Process to Support Scheduling Requirements in Modular Construction. Sustainability. https://doi.org/10.3390/su16020476.
Salman, N., & Hamadeh, M. (2023). The Integration of Virtual Design and Construction (VDC) With the Fourth Dimension of Building Information Modeling (4D BIM). International Journal of BIM and Engineering Science. https://doi.org/10.54216/ijbes.070101.
Wang, W., Weng, S., Wang, S., & Chen, C. (2014). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80. https://doi.org/10.1016/J.AUTCON.2013.10.009.